Work Duration and Manhours Calculator

Pick the type of work, enter the quantity and the crew, and get the duration in working and calendar days and the total manhours. Rates are typical GCC benchmarks for a 10 hour day, and you can replace them with your own.

Inputs

unit
unit

Benchmarks assume a 10 hour working day, common on GCC sites. A different day length scales the daily output in proportion.

Planix EngineeringDuration and manhours estimate
Duration0working days
Calendar time0calendar days
Daily output0per day
ManhoursHoursPer unit
Skilled00
Helpers00
Total00

Estimate

Add several activities to build a manhour estimate for a package or tender. Kept in this browser.

ActivityQuantityUnitRate per worker daySkilledHelpersWorking daysSkilled MHHelper MHTotal MHRemove

No activities yet. Set up an activity above and choose Add to estimate.

Benchmark productivity rates
ActivityUnitRate per 10 hour dayBasisNotes
How to use

From quantity to duration and manhours

The calculator divides the quantity by the crew's daily output, then converts the days back into manhours for every worker on the activity.

  1. Pick the workChoose the nature of work. The unit and a benchmark rate per skilled worker per 10 hour day fill in.
  2. Check the rateReplace the benchmark with your own site data when you have it. Reset brings the benchmark back.
  3. Enter quantity and crewAdd the total quantity, the skilled workers and the helpers you plan to use.
  4. Read the resultDuration in working days and calendar days, daily output, and skilled, helper and total manhours.
  5. Build an estimateAdd each activity to the estimate, then print it, save it as PDF or download a CSV for Excel.
Working daysQuantity ÷ (rate × skilled workers × hours per day ÷ 10)
Calendar daysWorking days × 7 ÷ working days per week
ManhoursWorkers × hours per day × working days

The benchmark rates are typical figures for GCC building sites under normal conditions. Real output depends on access, labour skill, heat, supervision and equipment. Use the results for early planning and tender checks, and confirm them against your own project records before you commit to a programme.

FAQ

Common questions

How the numbers are worked out and what to watch for.

Are helpers counted in the output?

No. Output is driven by the skilled workers only. Helpers add manhours for the same number of days, which is how most gang rates are built.

Why is a 10 hour day assumed?

Ten hours is a common working day on GCC sites, so the benchmark rates are per 10 hour day. If your day is shorter or longer, change Hours per working day and the daily output scales in proportion.

What is the difference between working days and calendar days?

Working days are the days the crew is on the activity. Calendar days add the rest days, using your working days per week. Public holidays and reduced summer or Ramadan hours are not included, so allow for them separately.

Why does precast ask for crews?

The precast benchmark is an output per erection crew, not per worker. Enter the number of crews and the workers in each crew so the manhours are counted correctly.

Can I save my estimate?

The estimate stays in this browser until you clear it. To keep a copy, print it or save it as PDF, or download the CSV and open it in Excel.

Next

More free tools

Every Planix tool runs in your browser. Nothing is uploaded.

SS
Built by Sajeeshkumar Sivan

Planning and project controls professional with 15 years on GCC building and infrastructure projects, working daily with Primavera P6 baselines, monthly updates and extension of time claims. Each Planix tool comes from that work.

About Planix Engineering

Run your site reporting on one platform

Productivity Intelligence turns daily crew records into efficiency, lost man-days and cost, with daily, consultant and monthly reports.