Work sequence
1. Before work starts
2. Sequence flowchart
3. Work sequence and inspection points
| No. | Activity and key requirements | Stage | Inspection |
|---|
Choose the MEP system and get the first fix, second fix and final fix sequence with a flowchart, for method statements, coordination and inspection planning.
| No. | Activity and key requirements | Stage | Inspection |
|---|
The tool runs in your browser. Nothing you type is uploaded, and your last inputs are remembered on this device.
Each step is tagged with its fix stage so the sequence lines up with the civil and finishes programme.
Short answers on using the output in method statements and ITPs.
They are typical MEP sequences for building works in the GCC, written as a starting point. Check every step, test pressure and duration against your approved specification, authority rules and ITP before you submit.
Test pressures, durations and acceptance values depend on the specification and the authority. Add them in the remarks or edit the steps for your project.
Yes. Press Edit these steps to copy the sequence into the custom editor, then add, remove or reword steps. End a line with [H] or [W] to mark an inspection.
Copy steps (pastes as a table into Word or Excel), Print, Flowchart PNG and a PDF method statement extract with the checklist, flowchart and step table.
Your inputs are saved only in this browser so they are there next time. Nothing is sent to a server.
Every Planix tool runs in your browser. Nothing is uploaded.