Primavera P6 Program Control Room

Turn an updated Primavera P6 XER schedule into an interactive project controls dashboard with progress, earned-value signals, WBS performance, forecast exposure and management actions.

Private by design: the XER is analyzed locally in your browser and is never uploaded.
1

Upload Baseline Program

Select the approved Primavera P6 baseline XER

2

Upload Updated Program

Select the current Primavera P6 update XER

Select the baseline and updated XER files to begin.

Project Control Room

P6 Schedule % CompleteN/ARequires exported baseline
Performance Complete0%P6 activity complete type
Cost Progress Variance0%Performance EV minus planned value
SPI0Schedule-derived EV / PV
Forecast Finish Variance0dCurrent versus planned finish
Float Exposure0Incomplete activities TF ≤ 0

Planix Progress Horizon

Time-phased planned value curve with current earned-value position

Activity Status Pulse

Current schedule population

WBS Performance Matrix

Active progress areas only; sort by percentage-point variance
WBSBudgetPlanned %Performance %VarianceTF ≤ 0

Planned vs Performance by WBS

Highest-variance active WBS areas; zero-zero rows excluded

Budget & Earned Value Position

Schedule-derived value signals from activity budgets and P6 performance complete

Planner's Action Brief

Automatically generated management talking points

Activity Variance Leaderboard

Activities with meaningful planned or performance progress; ranked by percentage-point gap
Top 25 decision items
RankActivityWBSPlannedPerformanceGapFinishFloat

Management Attention Register

Incomplete activities ranked by percentage-point gap
Activity IDActivity NameWBSStatusFinishTotal FloatPlanned Value %Performance %GapBudget

📣 Project narrative

The human read on the numbers — blocks save automatically on this device and print into the PDF.
On track

Primavera P6 programme reporting

P6 Dashboard Generator With Local XER Processing

This Primavera P6 dashboard generator turns baseline and updated XER schedules into a management-ready project control room. It helps teams review planned progress, performance progress, forecast variance, WBS performance, float exposure and schedule risk indicators. Your XER files are processed locally in the browser and are not uploaded to Planix Engineering.

How To Use The P6 Dashboard Generator

  1. Export the approved baseline or reference programme from Primavera P6 as an XER file.
  2. Export the current update programme as a second XER file.
  3. Upload both files into the browser-based dashboard generator.
  4. Review progress, variance, SPI, forecast finish and WBS performance signals.
  5. Download the Excel or PDF output for management reporting and project controls meetings.

What The Dashboard Helps Review

The control room is designed for programme update reviews where teams need a fast summary of schedule performance, risk and management actions.

  • P6 schedule percent complete and performance complete
  • Planned value, earned value and variance signals
  • SPI and forecast finish variance
  • Float exposure and incomplete critical activities
  • WBS performance and management narrative blocks

Technical Definitions

P6 Dashboard
A reporting view that summarizes Primavera P6 programme progress, variance, risk and forecast indicators.
Baseline Programme
The approved reference schedule used to compare planned dates, progress and completion targets.
SPI
Schedule Performance Index, a performance indicator comparing earned value against planned value.
Float Exposure
The number or concentration of incomplete activities with low, zero or negative total float.

P6 Dashboard Generator FAQ

Are my XER files uploaded?

No. The baseline and update XER files are processed locally in your browser. Planix Engineering does not receive or store your project schedule files.

Do I need both baseline and update XER files?

For the best dashboard output, use both an approved baseline or reference programme and the current update programme. This allows planned versus current performance comparison.

Can this replace project controls reporting?

No. It supports project controls reporting by turning P6 schedule data into a faster dashboard view. Teams should still review the underlying programme, logic, assumptions and contract requirements.

Who is this dashboard for?

It is useful for planners, project controls managers, project managers, directors and client teams who need a clear view of programme performance.