Quick Work Programme and Gantt Chart

Build a short internal programme without Primavera or Excel. Enter activities and dates, update progress, and the Gantt chart stays current, ready to download as a programme image or an Excel list.

ActivitiesDuration is in calendar days, counting the start and finish days. A one-day activity shows as a milestone.
# Activity Planned start Planned finish Duration Status Move or remove
Programme preview
The download is this programme at full width.
Planix EngineeringWork Programme
Work programme
Add activities above to draw the programme.
Planned
Milestone
Data date
Generated with Planix Engineering free tools · planixengineering.com
How to use

Build a short programme in a few minutes

For look ahead plans, package programmes and internal work plans that do not need a full Primavera P6 schedule. You type the activities and dates, and the Gantt chart redraws as you go.

  1. Set up the programmeEnter the project or area title, the data date and who prepared it. The data date shows as an amber line on the chart.
  2. Add activitiesType each activity with its planned start and finish. Duration is worked out in calendar days. A one-day activity is drawn as a milestone.
  3. Update progressSet the status of each activity. Turn on actual dates to draw an actual bar under the planned bar.
  4. DownloadDownload the programme as a PNG image for your report, or export the activity list to Excel.
Questions

Quick Gantt FAQ

Short answers for planners, engineers and site teams.

Is my programme uploaded anywhere?

No. Everything runs in your browser. The last programme is kept in this browser's local storage so it is still there when you come back. Clear all removes it.

Does it work out logic or the critical path?

No. It draws the dates you enter. There are no links, calendars or float. For logic and the critical path, use Primavera P6, and the Planix XER tools to review the result.

How is the duration counted?

In calendar days, counting both the start and the finish day. An activity that starts and finishes on the same day is shown as a milestone.

Can I change the timescale?

Yes. Automatic shows weeks for programmes up to about five months and months for longer ones. You can also pick weeks or months yourself. Weeks start on Monday.

What do the exports contain?

The PNG is the full programme with a header, summary figures, the Gantt chart and a legend. The Excel file lists each activity with its planned and actual dates, duration and status.

Next

More free tools

Every Planix tool runs in your browser. Nothing is uploaded.

SS
Built by Sajeeshkumar Sivan

Planning and project controls professional with 15 years on GCC building and infrastructure projects, working daily with Primavera P6 baselines, monthly updates and extension of time claims. Each Planix tool comes from that work.

About Planix Engineering

Run your site reporting on one platform

Productivity Intelligence turns daily crew records into efficiency, lost man-days and cost, with daily, consultant and monthly reports.